
Before — the work has just finished
Dust sheets on the floor, a paint tin, cutting dust, tools on the window sills. This is how the trades leave a property.
Full restoration clean after building work: deep dust removal, marks, glazing, construction residue. The building is handed over ready for acceptance.
An attic bedroom, photographed at two moments: as the trades moved out, then after our visit. Same room, same angle, no retouching.

Dust sheets on the floor, a paint tin, cutting dust, tools on the window sills. This is how the trades leave a property.

Floor cleaned, sills cleared, frames and glazing spotless, no residue. Between these two photos there was no building work and no retouching: only a visit from our teams.

Bags of tile adhesive, tile offcuts, protective coverings: the handover cannot take place in this state.

Floors washed, plaster and silicone marks removed. The home can be handed over to its owner.

Worktops, cabinet fronts, appliances and cupboard interiors: packaging, labels and dust.

Garages, cellars and plant rooms are part of the handover. Our equipment travels with us.
Post-construction cleaning is the final step before a building is handed over or formally accepted. It shapes the client’s final impression, the clearing of snagging items and, often, the release of the final contract payment. FHN Clean provides the full restoration clean after building work for contractors, developers, architects and private individuals in Mons, across Hainaut, in Wallonia and in Brussels. We work in new flats as well as on office floors, in detached houses, shops and service-sector building sites.
Save time: send us the floor area, the frequency you want and photos.
The quote form lets you upload images (current condition / access constraints), which speeds up the handling of your request.
📞 +32 65 22 92 44 · contact form
A structured method that delivers consistent, documented and repeatable results from one visit to the next.
Visual assessment, identifying the tough spots (paint, sealant, residues), handover schedule.
Split into zones, logical order (top → bottom, dry → wet), right-sized team.
Deep dusting, glazing, bathrooms, removal of heavy marks.
Fine details, finishing, checking the difficult areas (joints, frames).
Walk-round of the site with a checklist, before/after photos if needed.
Building handed over ready for acceptance, with no surprises for the project owner.
This is the standard format: a single job with a set start date and handover on a fixed date.
For large sites: an intermediate clean (once the structural work is finished), then a final clean before handover.
For developers with regular flat handovers: negotiated rate, dedicated team.
FHN Clean provides post-construction cleaning in Mons, throughout Hainaut, in Charleroi, La Louvière, Tournai and in Brussels. For sites in the neighbouring Flemish region, contact us and we will look at each case individually.


Entrance halls, stairwells, car parks, contracts for property managers (syndics).
View page →
Rue André Masquelier, Mons. A new student residence of 126 units, handed over in phases between February and June 2026. We carried out the handover clean — the clean that turns a unit finished by the trades into one that can be handed to an occupant. 193.9 hours logged, over 49 visits.
It isn’t cleaning, and that is where most of the quotes we are asked to redo go wrong. A new home does not contain dirt: it contains construction residues, and each one calls for a different technique.
That is the lesson this contract taught us, and we now build it into every proposal. A new unit cleaned only once gets dirty again before the keys are handed over: there is always one trade still to come back, a paint touch-up, a door to adjust. The first clean then serves to have the completion of the works formally recorded; the second, to hand over.
Hence our rates, which are public because they are ours: €3.50 per m² for the first pass, €3.00 for the second. The second costs less because it covers a unit that has already been treated — not because we take less care over it.
In a residence this size, the units are never all finished at the same time. Clean too early and you clean twice at your own expense; too late and you hold up the handing over of keys. So we work in phases, timed to actual progress, and it is the site manager who gives the go-ahead for each phase, not the calendar.
Between February and June 2026, that came to 49 separate visits. Each one is logged, time-stamped and geolocated in our system: the client can see who came, where, and for how long.
On the same site we also looked after the site welfare cabins: offices, canteen, changing rooms, toilets. Every week, on Tuesdays — never on site-meeting day, so as not to get under the feet of the site management. €85.00 excl. VAT per visit, fixed price.
It is a small job, and it is the one we are asked for most, because nobody wants to do it: too small for the big firms and too demanding for the small ones.
A new residence has glazing that no pole can reach. So we price the 17-metre cherry picker as an option, per day, charged only if it is used. A post-construction cleaning quote that says nothing about high-level glazing is a quote that will blow up along the way — or a site that will be handed over with dirty windows.
On a construction site, the handover clean is almost always subcontracted. We are asked for two things every time, and you should demand them from any provider:
This isn’t mere paperwork: an undeclared worker on your site makes you jointly and severally liable, not just us.
For a new home of typical size, allow half a day for one person on the first pass, and noticeably less on the second. What drives the time is not floor area: it is the number of wet rooms (a new bathroom takes twice as long per m² as a bedroom) and the amount of glazing.
We price after a site visit, from plans if the site is not accessible, and we commit to the condition at handover — not to a number of hours.
A site is handed over once. If the cleaning is badly placed in the schedule, it has to be redone — and it is always the cleaning that gets the blame, never the order of the works. Here is how we avoid that.
That is the rule that makes the difference between a handover that goes through and one that stalls.
As soon as the messy trades have finished: removal of fine debris, lifting plaster, filler and paint splashes, taking off protective coverings and joinery labels, first pass on the floors.
As close to handover as possible: full dusting, windows and frames, bathrooms, touch points, final floor clean. After this pass, nobody works in the premises any more.
Why two: construction dust is fine and stays suspended in the air. Cleaned too early, it settles again within forty-eight hours and the result seems undone. A single pass placed too early therefore costs twice: the first time for nothing, the second in a rush.
The price of post-construction cleaning is often quoted per m², and that is misleading: two sites of the same size can differ by a factor of three. What really matters:
| Factor | What difference it makes |
|---|---|
| New build or renovation | A renovation in occupied premises creates more mess and is worked area by area |
| Density of bathrooms and kitchens | These are the slowest rooms; a bare floor plate goes quickly |
| Glazed area | A cost item in its own right, often forgotten in comparisons |
| Cleanliness on arrival | Rubble left on site means clearing before cleaning |
| Access and floors | Without a lift, equipment and water go up by hand |
We price after a site visit. On large developments — student housing, buildings handed over in batches — we work per unit delivered, with a first-pass rate and a follow-up rate, so the project owner can track progress instead of waiting for one overall invoice.
We always ask for an inspection walk-round with you before the keys are handed over. Anything noted is put right there and then, not on the next visit. It is quicker for everyone than a snagging list circulating by email for three weeks.
Describe what you need in a few lines. We’ll reply within 24 working hours with a clear proposal.